Ask any architect with two decades of experience what he would advise his new client, and he would say the following: go to one of his completed projects a couple of years after completion of the project. He means visit, not go through a photographic set of pictures. Closed doors, no water

The majority of a building's expense is already set in stone before even the contractor has been hired. When you have a wall that jogs in and out, you are going to get extra corners. Corners mean extra framing, extra flashing, and extra work. A roof with six valleys is going to leak twice as much as a roof with only two valleys. These kinds of choices are made by an architect or design services firm when the lines on paper are free to be changed at no cost.

How Residential Architectural Design Starts

Residential Architectural Design begins with a programming stage, in which the function of the house is outlined in the form of a simple program list. A four-bedroom house, an enclosed home office space, a mudroom next to the garage, and a seating capacity of six people in the kitchen. The architect combines this information with information about the location. A sloping lot 8 feet between the front and back indicates the need for a walk-out basement. An urban lot might require a three-story design with living spaces above in order to receive sunlight.

The schematic design stage comes next and typically takes between three and six weeks. The architect designs two to three possible floor plan configurations and a massing model and then the client responds to this information. The orientation of the building is decided upon at this stage, since a south-facing glazing wall with a 3-foot roof overhang would warm up the house in winter and provide shade during the summer. Once this phase is signed off on, the project proceeds to the design development phase.

Where Commercial Building Designers Spend Most of Their Time 

Commercial Building Designers have more restrictions and consequences to bear. Classifying occupancy under the International Building Code is key: a restaurant is classified as A-2, an office is classified as B, and a day care falls under category E. All of these classifications have different exit widths, fire ratings, and sprinklers. An additional stairway designed and incorporated near the end may take away 400 square feet of rental floor area, making a well-designed commercial building essential.

Coordination is what makes up the bulk of the designer's job. The architect has a team of structural, mechanical, electrical, and civil engineers, and all systems must compete for space within the ceiling. The conflict between a 24 inch duct and a 20 inch beam is a classic example of such conflicts. The conflict is usually detected in Revit before any drawing is sent through, as it is much cheaper than cutting a hole in a built beam. Tenants, lenders, and the fire marshal need their input too.

Why Architectural Planning Services Come Before Drawings

Architectural Planning Services cover the work that happens before a single floor plan gets drawn. They include zoning review, setbacks, feasibility studies, and test fits. The developer contemplating a site of 0.6 acres needs to find out whether the 30 percent lot coverage and 35-foot height limits will even support the 18 units assumed by the pro forma. Sometimes the answer is 14 units, and the transaction gets changed around.

Planners are also experts at reading the paper that nobody likes to read. Easements, floodplains, utilities, and historic overlay maps can ruin any floor plans. If a sewer main crosses across the rear third of a property, then the only place you can build is not on this particular lot. An expenditure of $5,000 to $15,000 for a feasibility study could save a $400,000 property investment from trouble. Few real estate investments yield as much information per dollar spent.